Electrical Power Installs

In Building@EPS, TMAC by bbaldwin

This is big week for the building as we prepare to energize. New cable has been pulled, a cement vault called a “hand hold” has been installed and the electrical feeds to supply the building with 1600 amps of new power (the old building had 600 amps). Some serious cable has been pulled. On Thursday this week Puget Sound Energy will be out to make the tie in and we will be up and running!

 

IMG_4321