It won’t be too much longer before the structure begins to rise out of the hole. Once excavation reaches the “bottom of the hole” they will begin to excavate for the footings. This is the concrete pads that create the structural bases for the building. There are some significant footings that support the building. Check out this diagram. The red areas indicate the concrete in the new building and the blue areas, the steel.